The main aim of this action has been to carry out an engineering activity based on the requirements evaluation performed in WP2. The objective has been to identify technical specifications and a operative procedure for the following implementation and integration action (WP4). In this WP, the logical and functional architecture of the single components and of the integrated system have been defined, the hardware components have been selected and where needed have been designed at hoc. Software components as well as interfaces, communications aspects and protocols have been specified.

This Action is organized in two different Tasks:

Task 3.1 Supervisor Centre design, which has covered the engineering activities related to the Environmental Supervisor Centre

Task 3.2 Mobile systems design, which has covered the engineering activities related to the mobile probes.